Case 01
Heavyweight capsule, 8 weeks early.
How a fast-growing streetwear label moved from a tech-pack-less idea to a 3,600-piece drop — placeholder case study.
The challenge
The brand had a strong community and a mood board, but no tech packs, no fabric supplier and a hard launch date tied to a collaboration. Their previous vendor required 500 pieces per color.
Our solution
Our ODM team translated references into three graded tech packs, sourced a 420 GSM brushed terry at a 300 m MOQ, and delivered 3D protos in 72 hours. Physical samples were approved in one round.
- 3D sampling cut physical rounds from 3 to 1
- Custom garment dye in 4 colorways
- 3D puff embroidery developed in-house
- DDP shipping to their 3PL warehouse


Results
- 0wks
- Faster than planned
- 0pcs
- First drop
- 0%
- Defect rate (≤)
- 0×
- Re-orders in 12 mo
* Placeholder figures for illustration.
“Placeholder testimonial — they felt like an extension of our design team, not a vendor.”
Client NameFounder, streetwear label (placeholder)
Planning a drop?
We’ll map a timeline backwards from your launch date.



